PENILAIAN RISIKO DAN PENENTUAN SISA UMUR TERHADAP PIPA GAS TEE 24" DI PT.X DENGAN MENGGUNAKAN METODE RISK BASED INSPECTION
DOI:
https://doi.org/10.19184/rotor.v12i1.14425Abstract
Risk Based Inspection (RBI) of 24†oil pipe according API 581 has been conducted. The analysis shows that the piping system has medium risk. The remaining life is between 6-7 years. Because piping failure is due thinning, the next inspection using NDT is suggested not more half of the remaining life.
Downloads
Download data is not yet available.